After regular inspection to make sure that the rock mucking loading machine is in good condition, open the lock, send the start signal, evacuate the personnel to a safe place, drive the empty car for
On September 5, a batch of fixed mine cart equipment was loaded in the intelligent equipment manufacturing workshop of China Coal Group and sent to Shanghai Port. The fixed mine cart shipped this time
On September 3, a batch of single hydraulic prop equipment for mining was loaded in the intelligent equipment manufacturing workshop of China Coal Group and will be sent to a mine in Kuche, Xinjiang.
The mucking loading machine loads ore or rocks in horizontal or gently inclined tunnels. Because of mucking loading machine its flexible and reliable work and high rock loading productivity, it is wid